Baspa-II, JSW Energy's first hydro venture, exemplifies renewable leadership. With 300 MW capacity, advanced hydro engineering, and eco-sensitive operations, it delivers sustainable power and long-term energy security.
Ownership & Location
Operator
JSW Energy
Location
Baspa, Himachal Pradesh
River Basin
Baspa River
Plant Configuration and Capacity
Total Installed Capacity
300 MW
Annual Power Generation
1,213 GWh
Total Net Power Generated
1,351 MUs
Key Highlights
Sustainability and Environmental Responsibility
Strategic Approach
Responsible Development, Zero Displacement
Designed for sustainability, Baspa-II operates without resettlement, safeguarding communities and ecology.
Biodiversity-friendly Hydro Power
Baspa-II's run-of-river design harnesses natural flow, minimising reservoirs, ecological impact, and community disruption.
Sediment-smart Water Management
Baspa-II combines sediment management and smart water conveyance to optimise operations and preserve ecology.
Decades of Reliable Hydro Supply
With a 40-year PPA, Baspa-II powers Himachal reliably, securing fixed-cost recovery and sustainable energy delivery.
Kinnaur's River-Powered Future
Situated in Kinnaur, Himachal Pradesh, Baspa-II taps the Baspa River with a powerhouse near Karcham.
Eco-smart Cavern Powerhouse
Underground caverns house Baspa-II's plant and switchgear, with a 400 kV grid link powering the region.